| Let Date: 9/30/2010 |
76366 - Carbon BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$2500000 - $ 5000000
Requirements:
No listed requirements
DBE %: 0.00 MBE %: 3.00 WBE %: 2.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
For the replacement of the existing structure carrying SR 2007 over the Pohopoco Creek in CARBON COUNTY, FRANKLIN TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 2007, SECTION 01B. The project being situated as follows: SR 2007 -- From the intersection with SR 0209 at Station 0+00.00 to a point approximately 525 ft (0.10 mile) from this intersection at Station 5+30.00. Removal of an existing structure, construction of a new structure, construction of roadway work consisting of full depth pavement, guiderail, drainage, pavement markings, implementing traffic control including detouring of traffic, and construction of a traffic signal all included within an overall project length of 398.91 linear feet (0.076 mile) as indicated on the approved drawings included in the bid package.
|
| Let Date: 9/16/2010 |
6394 - Montour BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$500000 - $ 1000000
Requirements:
No listed requirements
DBE %: 1.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project are as follows: For the replacement of the existing structure with a one span composite prestressed concrete spread box beam bridge or approved equal over Mahoning Creek including removal of the existing bridge, drainage, superpave asphalt mixture design HMA base and wearing courses, guide rail, and other related work within an overall length of 377.46 linear feet (0.071 miles) all as indicated on the approved drawings included in the bid package for TOWNSHIP ROAD 386 from approximately 0.51 miles north of the intersection with State Road 2007 at Station 9+25.00 to approximately 0.05 miles south of the intersection with State Road 642 at Station 15+00.00 in VALLEY TOWNSHIP, MONTOUR COUNTY.
|
16433 - Montgomery WIDENING (ADDITIONAL LANES)
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$5000000 - $ 7500000
Requirements:
No listed requirements
DBE %: 8.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
This project is for improvement of intersection SR 2027, Section 001 (Pennsylvania Avenue) and SR 2028, Section 001 (Camp Hill Road) located in Springfield and Upper Dublin Townships, Montgomery County, Pennsylvania. This intersection improvement project involves realignment of the SR 2028 approaches to eliminate the dog-leg alignment of its intersection with SR 2027, and relocates the existing traffic signals. A retaining wall is proposed on the southeast corner of the intersection to avoid impacting a springhouse. Also, the SR 2027 approaches will be widened, providing turning lanes from both approaches.
|
20912 - York BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$500000 - $ 1000000
Requirements:
No listed requirements
DBE %: 5.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
This project involves the replacement of the one-span bridge over Bald Eagle Creek, minor drainage and approach work, guiderail updates, pavement markings, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0425, SECTION 003, in YORK COUNTY, FAWN TOWNSHIP, from Segment 0110 Offset 1648 to Segment 0110 Offset 2597, for an overall project length of 849.00 linear feet (0.161 mile).
|
27957 - Allegheny MISCELLANEOUS
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$500000 - $ 1000000
Requirements:
No listed requirements
DBE %: 3.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: and other miscellaneous construction, all within a length of 8,970 linear feet (1.699 Miles) as indicated on the approved drawings contained in the Bid Package for STATE ROUTE 1001, SECTION A32, in ALLEGHENY COUNTY, BRACKENRIDGE BOROUGH, HARRISON TOWNSHIP from approximately the intersection with Sycamore Street at Segment 420 Offset 355 to approximately the intersection with Princeton Avenue at Segment 450 Offset 2770.
|
47883 - Beaver WIDENING (ADDITIONAL LANES)
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$2500000 - $ 5000000
Requirements:
No listed requirements
DBE %: 5.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: traffic signal updates, minor roadway widening including center turn lanes and other miscellaneous construction, all within a length of 5,956.23 linear feet (1.128 Miles) as indicated on the approved drawings contained in the Bid Package for STATE ROUTE 68, SECTION B18, in BEAVER COUNTY, VANPORT TOWNSHIP from approximately 200 feet east of the interchange with SR 60 at Segment 280 Offset 1960 to a point approximately 50 feet east of SR 4028 (Buffalo Street) at Segment 320 offset 51.
|
56648 - Somerset R&R EXISTING SUPERSTRUCTURE WITH FULL WIDTH CONST
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$200000 - $ 500000
Requirements:
No listed requirements
DBE %: 4.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: This project consists of a superstructure replacement with repairs to the existing substructure with minimal roadway approach work, drainage and guide rail upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4026, SECTION 01B, in SOMERSET COUNTY, SOMERSET TOWNSHIP at the following location: STATION 29+52.00 TO STATION 34+80.00 SEGMENT 0020, OFFSET 1187 TO SEGMENT 0020, OFFSET 0656
|
58184 - Erie BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$1000000 - $ 2500000
Requirements:
No listed requirements
DBE %: 5.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
For the construction or improvement of a certain sections of STATE HIGHWAY in ERIE COUNTY, WAYNE TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0006, SECTION B04 and STATE ROUTE 0006, SECTION B06. This project is situated as follows: SR. 6-B04 - From approximately 5.68 miles east from the intersection with SR 0008 at Segment 0390 Offset 1195 (Station 10+50.00) then east to approximately 0.12 mile west of the intersection with SR 0089 at Segment 0390 Offset 1845 (Station 4+00.00). SR 6-B06 - From approximately 1 mile east from the intersection with T-303 at Segment 0380 Offset 1397 (Station 36+00.00) then east to approximately 0.6 mile west of the intersection with SR 0089 at Segment 0380 Offset 1797 (Station 32+00.00). For the construction of a 1 Span Composite Prestressed Concrete Spread Box Beam Bridge over Beaver Run having an overall length of 52 feet and for the construction of a Precast Reinforced Concrete Box Culvert over Branch of Beaver Run having an overall length of 10'' ; Also for the bituminous and concrete approaches, sheet piling, drainage, guiderail, signs, and pavement markings all within a project length of 832 feet (0.158 mile) as indicated on the approved drawings.
|
69109 - Beaver BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$1000000 - $ 2500000
Requirements:
No listed requirements
DBE %: 0.00 MBE %: 3.00 WBE %: 3.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: For the bridge replacement, approach roadway, and other miscellaneous construction, all within a length of 725 linear feet (0.137 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0351, SECTION B08 (Crescent Drive), in BEAVER COUNTY, DARLINGTON TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 50 feet west of Sylvania Drive (T-679) at Segment 0030 Offset 3658 (Station 171+50) to approximately 1300 feet east of County Line Road (T-370) at Segment 0030 Offset 2807 (Station 180+00).
|
74741 - Luzerne RESURFACING/OVERLAYS
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$200000 - $ 500000
Requirements:
No listed requirements
DBE %: 1.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: For the improvement of several streets in AVOCA BOROUGH, in LUZERNE COUNTY, Commonwealth of Pennsylvania. This project area includes: Second Street, Third Street Russell Street, Clark Street, Grove Street, South Street and Plane Street, all located within Avoca Borough. The project includes the construction of concrete curb and sidewalk, milling and bituminous paving along a total length of approximately 4135.55 feet, 0.783 miles all as indicated on the approved drawings included in the bid package.
|
77246 - Allegheny STEEL STRUCTURES
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$500000 - $ 1000000
Requirements:
No listed requirements
DBE %: 4.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: For the steel pedestrian bridge, minor approach work, landscaping, and other miscellaneous construction, all within a length of 406 linear feet (0.077 miles) as indicated on the approved drawings included in the bid package for JR TAYLOR MEMORIAL BRIDGE (over Clifton Road SR 3004), in ALLEGHENY COUNTY, BETHEL PARK BOUOUGH, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 211 feet west of SR 3004 and Highfield Road at Station 9+93 to a point approximately 195 feet west of SR 3004 and Highfield Road at Station 13+99.
|
79424 - Westmoreland BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$500000 - $ 1000000
Requirements:
No listed requirements
DBE %: 0.00 MBE %: 2.00 WBE %: 2.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
This project consists of the full replacement of the existing single span concrete T-Beam structure and associated approach roadway. The structurally deficient bridge will be replaced with a P/S Concrete Box Beam structure. One aerial utility relocation is anticipated to be needed to accommodate the construction. The new structure will be constructed on the existing horizontal and vertical alignments. Throughout construction, the existing structure on S.R. 4034 will be closed to traffic and a signed detour route will be posted. The limits of work for the STATE ROUTE 4034, SECTION E10, project in WESTMORELAND COUNTY ALLEGHENY TOWNSHIP will begin 72 feet east of the intersection with T-691 (Ridgeview Drive), segment 0080 offset 2830, and extend east to a point 141 feet west of the intersection with MAWC''s private drive, segment 0080 offset 3280.
|
82544 - Armstrong BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$2500000 - $ 5000000
Requirements:
No listed requirements
DBE %: 0.00 MBE %: 1.00 WBE %: 1.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: For the Design/Build replacement of five structures carrying PA 68 and SR 4007 (Kaylor Petrolia Road) over Sugar Creek, Pine Run, and a branch of Sugar Creek with minimum approach roadway work and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 68, SECTION 153, in Armstrong COUNTY Brady''s Bend TOWNSHIP from approximately 1.5 miles west of Brady''s Bend at segment 0060 offset 0181 to approximately one mile east of the Armstrong County/ Butler County line at segment 0020 offset 1515.
|
86410 - Allegheny NEW AND REVISED MAJOR TRAFFIC SIGNALS
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$1000000 - $ 2500000
Requirements:
No listed requirements
DBE %: 2.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: For the construction of traffic signal interconnect, replacement of signal controller equipment, signal timing revisions, replacement of signal indications, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for the SPC''s REGIONAL TRAFFIC SIGNAL PROGRAM, on VARIOUS STATE ROUTES, in ALLEGHENY, BEAVER, and WASHINGTON COUNTIES, VARIOUS MUNICIPALITIES, Commonwealth of Pennsylvania. This project being situated as follows: At various locations throughout Allegheny, Beaver, and Washington Counties.
|
| Let Date: 9/30/2010 |
351 - Crawford BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$500000 - $ 1000000
Requirements:
No listed requirements
DBE %: 1.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
For the design and construction of certain section of STATE HIGHWAY in CRAWFORD COUNTY, ROCKDALE TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 1035 SECTION B01. This project being situated as follows: From approximately 1.3 miles north of the intersection with SR 1016 (Station Rd) at Station 163+35.15 to approximately 2.6 miles south of the Crawford/Erie County Line at Station 169+84.40. For design and construction of a single span bridge over Kelly Run having an overall span of 80.00 feet; design and construction of new approach roadways using Superpave Asphalt Mixture Designs; Design and Construction of Guide Rail, Paved Shoulders, Delineation, Pavement Markings and Signing all within a project length of 549.25 feet (0.104 mile) as indicated on the approved conceptual drawings.
|
2586 - Warren BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$1000000 - $ 2500000
Requirements:
No listed requirements
DBE %: 5.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
For the construction of a certain section of STATE HIGHWAY in WARREN COUNTY, PITTSFIELD TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0027 SECTION B02. This project being situated as follows: From approximately 3 miles east of the intersection with SR 0426 (PA 426) at Sta 1023+50.00 to approximately 56 feet east of the intersection with SR 3007 (Dalrymple St/Davey Hill Rd) at Sta 1032+80.00. For construction of a two span prestressed concrete box beam bridge with a total span of 136.0 feet; construction of new approach roadways using Superpave Asphalt Mixture Designs; guiderail, drainage, delineation and pavement markings all within a project length of 880.00 feet (0.167 mile) as indicated on the approved drawings.
|
22496 - Cambria R&R EXISTING SUPERSTRUCTURE WITH HALF WIDTH CONST
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$1000000 - $ 2500000
Requirements:
No listed requirements
DBE %: 5.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: This project consists of a truss rehabilitation including deck replacement, steel repairs and painting of the superstructure. Roadway approaches will be reconstructed on existing alignment to match the existing pavement along with guide rail updates and other miscellaneous construction all as indicated on the approved drawings included in the bid package for STATE ROUTE 1008, SECTION 01B, in CAMBRIA COUNTY, EAST CARROLL, CLEARFIELD & ALLEGHENY TOWNSHIPS at the following locations: STATION 149+00.00 TO STATION 154+75.00 SEGMENT 0030, OFFSET 2574 TO SEGMENT 0030, OFFSET 1999
|
29895 - Fayette BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$1000000 - $ 2500000
Requirements:
No listed requirements
DBE %: 0.00 MBE %: 1.00 WBE %: 1.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: This project will consist of a bridge replacement and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 1087, SECTION D10, in Fayette COUNTY city of Connellsville from approximately segment 0080 offset 0300 to approximately segment 0080 offset 0900.
|
62790 - Allegheny MISCELLANEOUS REHABILITATION WORK
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$10000000 - $ 12500000
Requirements:
No listed requirements
DBE %: 6.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: This is a Design Build roadway project. Design activities are limited to: Stream crossing, temporary roadway crossovers, and utility coordination. For the deck replacement, latex overlay, expansion dam replacement, substructure repair, bituminous pavement, drainage, guide rail, pavement marking, culvert cleaning and stream restoration, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0079, SECTION A49 (Interstate 79), in ALLEGHENY COUNTY, MARSHALL TOWNSHIP, FRANKLIN PARK BOROUGH, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 1629 feet south of Wexford Bayne Road (SR 910) at Segment 0724/0731 Offset 2350/0971 (Station 692+22/706+00) to a point approximately 770 feet north of Warrendale-Bayne Road at Segment 0754/0765 Offset 2019/0387 (Station 853+50/858+00).
|
76366 - Carbon BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$2500000 - $ 5000000
Requirements:
No listed requirements
DBE %: 0.00 MBE %: 3.00 WBE %: 2.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
For the replacement of the existing structure carrying SR 2007 over the Pohopoco Creek in CARBON COUNTY, FRANKLIN TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 2007, SECTION 01B. The project being situated as follows: SR 2007 -- From the intersection with SR 0209 at Station 0+00.00 to a point approximately 525 ft (0.10 mile) from this intersection at Station 5+30.00. Removal of an existing structure, construction of a new structure, construction of roadway work consisting of full depth pavement, guiderail, drainage, pavement markings, implementing traffic control including detouring of traffic, and construction of a traffic signal all included within an overall project length of 398.91 linear feet (0.076 mile) as indicated on the approved drawings included in the bid package.
|
81925 - Clearfield BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$10000000 - $ 12500000
Requirements:
No listed requirements
DBE %: 1.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: For the Design and Construction of a certain section of STATE HIGHWAY in CLEARFIELD COUNTY, GRAHAM and COOPER TOWNSHIPS, Commonwealth of Pennsylvania, STATE ROUTE 0080, SECTION B36 - This project being situated as follows: On SR 0080 Eastbound from Segment 1314 Offset 2533 to Segment 1334 Offset 0105 and SR 0080 Westbound from Segment 1325 Offset 1027 to Segment 1335 Offfset 1567 for a total construction length of approximately 1.5 miles. For the Design and Construction of four replacement bridges. Two Single-Span Comp. P/S Concrete PA Bulb-Tee Beam Bridges for Eastbound and Westbound SR 0080 Over SR 2037 (bridge lengths of approximately 85 feet each). Two Three-Span Cont Composite Steel Plate Girder Bridges for Eastbound SR 0080 (approximately 215 feet) and Westbound SR 0080 (approximately 259 feet) Over SR 0053. Design and construction of roadway and traffic control. Construction includes traffic signal supports, conduit, signal cable, and miscellaneous construction as indicated on the approved construction drawings.
|
87080 - Union MISCELLANEOUS
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$2500000 - $ 5000000
Requirements:
No listed requirements
DBE %: 2.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: For the construction of a pedestrian walkway including excavation, select borrow excavation rock, subbase, superpave asphalt mixture design, HMA base and wearing courses, pipe installation, cement concrete sidewalk, wood fencing, pavement markings and legends, and other related work within an overall length of 47,818.00 linear feet (9.057 miles) all as indicated on the approved drawings included in the bid package for the BUFFALO VALLEY RAIL TRAIL from approximately the intersection with Tenth Street in Mifflinburg at Station 35+00.00 to approximately the intersection with SR 15 in Lewisburg at Station 526+53.00 located in WEST BUFFALO, BUFFALO, and EAST BUFFALO TOWNSHIPS and MIFFLINBURG and LEWISBURG BOROUGHS, all in UNION COUNTY.
|
87381 - Allegheny SLIDES CORRECTION
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$500000 - $ 1000000
Requirements:
No listed requirements
DBE %: 2.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: This is a Design Build roadway project. Design activities are limited to: landslide remediation, roadway reconstruction and utility coordination. For the repair of a landslide and reconstruction of bituminous roadway, drainage and other miscellaneous construction, all within a length of 185.0 Linear feet (0.035 Miles) as indicated on the approved drawings included in the Bid Package for STATE ROUTE 2086, SECTION A03, in ALLEGHENY COUNTY, PLUM BOROUGH, Commonwealth of Pennsylvania. This project being situated as follows: from approximately 800 feet east of Elicker Road (Local Road) at Segment 20 Offset 1633 to a point approximately 1000 feet east of Elicker Road at Segment 20 Offset 1868.
|
88514 - Allegheny SLIDES CORRECTION
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$2500000 - $ 5000000
Requirements:
No listed requirements
DBE %: 3.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: This is a Design Build roadway project. Design activities are limited to: landslide remediation, roadway reconstruction and utility coordination. For the repair of a landslide and reconstruction of bituminous roadway, and other miscellaneous constructionall within a length of 375.00 Linear feet (0.071 Miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 2110, SECTION A07, in ALLEGHENY COUNTY, CHURCHILL BOROUGH from approximately 400 feet west of the intersection with SR 130 (Beulah Road) at Segment 30/31 Offset 2749/2709 to a point approximately 1000 feet west of the same intersection at Segment 30/31 Offset 1749/1709.
|
| Let Date: 10/7/2010 |
5286 - Bradford BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$1000000 - $ 2500000
Requirements:
No listed requirements
DBE %: 1.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project are as follows: For the replacement of the existing structure over Seeley Creek including removal of existing bridge, construction of new and temporary structures, construction and removal of temporary roadway, foreign borrow excavation, selected borrow excavation rock, superpave asphalt mixture design, HMA base and wearing courses, pipe installation, guide rail upgrades, pavement markings, and other miscellaneous construction within an overall length of 925.00 linear feet (0.175 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 328, SECTION 023 in BRADFORD COUNTY, WELLS TOWNSHIP from approximately 0.1 mile north of the intersection with SR 549 at Segment 40 Offset 0699 to approximately 0.1 mile south of the New York state line at Segment 40 Offset 1824.
|
7494 - Union BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$1000000 - $ 2500000
Requirements:
No listed requirements
DBE %: 5.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project are as follows: For the construction of a 119 foot one span composite steel multi-girder bridge and the rehabilitation of a 127 foot two span continuous steel beam bridge, both over White Deer Hole Creek including removal of existing bridge, removal of portion of existing bridge, select borrow excavation rock, drainage, superpave asphalt mixture design, HMA base and wearing courses, guide rail, pavement markings, and other related work within an overall length of 890.00 linear feet (0.168 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 1012, SECTION 004 from approximately 0.07 miles south of the intersection with State Route 44 at Segment 0010, Offset 0240 to approximately 2.16 miles northwest of the intersection with State Route 15 at Segment 0010, Offset 0610 and for STATE ROUTE 1012, SECTION 005 from approximately 1.24 miles southeast of the intersection with State Route 44 at Segment 0030, Offset 2584 to approximately 0.95 miles west of the intersection with State Route 15 at Segment 0040, Offset 0539 both in GREGG TOWNSHIP, UNION COUNTY.
|
21897 - Blair BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$1000000 - $ 2500000
Requirements:
No listed requirements
DBE %: 5.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project is as follows: This project consists of replacing the existing bridge (Ironville Bridge) carrying SR 1014 over the Little Juniata River. The new bridge will be constructed on a new alignment downstream of the existing bridge. Both of the roadway approaches along SR 1014 and SR 1015 will be improved with minor adjustments to horizontal and vertical geometry to safely tie into the new structure and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 1014, SECTION 03B, in BLAIR COUNTY, SNYDER TOWNSHIP at the following locations: SR 1014, SECTION 03B STATION 10+59.34 TO STATION 7+50.00 SEGMENT 0010, OFFSET 0000 TO SEGMENT 0010, OFFSET 0691 SR 1015, SECTION 003 STATION 370+78.00 TO STATION 379+00.00 SEGMENT 0160, OFFSET 2096 TO SEGMENT 0170, OFFSET 0203
|
76486 - Lycoming MISCELLANEOUS
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$2500000 - $ 5000000
Requirements:
No listed requirements
DBE %: 5.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
The description and location of the project are as follows: For the rehabilitation of the existing roadway including flexible base replacement, milling, roadway widening, paved shoulders, inlets, pavement base drain, manholes, drainage, superpave asphalt mixture design HMA scratch, binder and wearing courses, edgeline rumble strips, guide rail, installation of concrete median barrier, pavement markings, realignment of a state forest access road, intersection improvements, and other related work within an overall length of 18,975 linear feet (3.59 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 15, SECTION 116 from approximately 0.5 miles north of the intersection with State Route 54 at Segment 0100 Offset 0027 to approximately 0.4 miles east of the intersection with T-433 (Old Montgomery Pike Road) at Segment 0190 Offset 1486 in CLINTON and ARMSTRONG TOWNSHIPS; and STATE ROUTE 15, SECTION 137 from approximately 0.4 miles east of the intersection with T-433 (Old Montgomery Pike Road) at Segment 0190 Offset 1486 to approximately 0.13 miles west of the intersection with T-433 (Old Montgomery Pike Road) at Segment 0200 Offset 2065 in ARMSTRONG TOWNSHIP, all in LYCOMING COUNTY.
|
87368 - Lancaster MISCELLANEOUS REHABILITATION WORK
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$15000000 - $ 20000000
Requirements:
No listed requirements
DBE %: 6.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
This project consists of bridge preservation of the existing structure over the Susquehanna River, including the replacement of expansion joints, fabricated structural steel repairs, concrete bridge deck repair, latex modified concrete weraing surface, zone painting, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0030, SECTION 092, in LANCASTER COUNTY, COLUMBIA BOROUGH & WEST HEMPFIELD TOWNSHIP, from Segment 0010/0011 Offset 0000/0000 to Segment 0020/0021 Offset 1334/1334, and in YORK COUNTY, HELLAM TOWNSHIP, from Segment 0550/0551 Offset 0844/1054 to Segment 0550/0551 Offset 2982/3192, for an overall project length of 8998.15 linear feet (1.71 miles).
|
| Let Date: 12/2/2010 |
31042 - Washington BRIDGE REPLACEMENT
Show More...
Posted:9/2/2010
From ECMS?Yes
Posted By: DBE SSC
Source:PennDOT ECMS eBidding
Cost Range:$25000000 - $ 30000000
Requirements:
No listed requirements
DBE %: 7.00 MBE %: 0.00 WBE %: 0.00
Contact:
Nathan Heitzman, DBE Supportive Services Center - Project Coordinator Email Me
Details:
This project includes the reconstruction of the existing interchange from a partial clover leaf with limited acceleration and deceleration lane lengths to a full diamond interchange utilizing acceleration and declaration lanes meeting current AASHTO design criteria. The project will include the replacement of a 3-span steel girder bridge carrying S.R. 0070 over S.R. 0519 and an extension of an existing concrete arch culvert that carries S.R. 0070 over Little Chartiers Creek. Additionally, the proposed project will widen the existing S.R. 0070 median and add two signalized intersections at the junction of the ramps and S.R. 0519 for the proposed diamond interchange. S.R. 0519 will be widened to provide for the proposed left hand turning lanes on to the Eastbound and Westbound acceleration ramps. The profile on S.R. 0070 and S.R. 0519 will be adjusted to meet a minimum 16''-6" clearance. The project will reconstruct approximately one mile (5,500-ft) of S.R. 0070 (including replacing the S.R. 0070 Structure), approximately 1,700 of S.R. 519, and include the realignment of three township roadways adjacent to S.R. 0070. The project includes this work and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0070, SECTION Y20, in Washington COUNTY, South Strabane and SomersetTOWNSHIPS from approximately 3.3 miles east of S.R. 0079 at segment 0240 EB and 0241WB offset 0561EB and 0561WB to approximately 2.5 miles west of S.R. 1055 at segment 0250EB and 0251WB offset 2366EB and 2339WB.
|